1. Where are you located ?      

Our factory located in Chashan Town,Dongguan, Guangdong,China, 10 minutes driving from Dongguan Railway Station


2. Can I get samples for Testing ? How long will it take ? And lead time for the mass products ?     

Samples for testing is available, May have some charges for it, but it's fully refundable in mass orders. Sample lead time, 5 to 7 days, and for mass production, the lead time is 35 to 45 days. 


3. How do you control the quality ?   

When we got your orders, we'll purchase the reliable quality materials(same with the approved samples). And during the production, we have the quality control person to check the quality at the assembling line. All products will be checked before shipping.


4. How do you ship the products ?   

Usually it will be shipped by sea, by air, by express, or according to your request.

Check your information